Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
1. |
27-Apr-2022 06:05 PM |
05-May-2022 10:30 AM |
05-May-2022 11:00 AM |
DESILTATION OF MAJOR DRAIN IN 13TH, 14TH CIRCLES (43,44,45,46,47,48,49,50) DIVISIONS OF KMC./ROC.NO.411032/2022/E2/498999 |
Andhra Pradesh |
-- |
2. |
27-Apr-2022 06:04 PM |
05-May-2022 10:30 AM |
05-May-2022 11:00 AM |
CONSTRUCTION OF C.C. ROADS, C.C. DRAINS MATHIGAMMA TEMPLE, TEA SHOP OPPOSITE, CHURCH BESIDE MULLARAMMA TEMPLE BACK SIDE IN VARIOUS LOCATIONS CONNECTED TO AMRUTH MAJOR DRAINS IN 14, 15 DIVISIONS./ROC.NO.373501/2022/E2/499006 |
Andhra Pradesh |
-- |
3. |
27-Apr-2022 07:59 PM |
05-May-2022 10:30 AM |
05-May-2022 11:00 AM |
ZPPF/4/ZPPF (2021-22)grant,dt.11.04.2022 of the Executive Engineer, PRI Division, Kakinada/499033 |
Andhra Pradesh |
-- |
4. |
21-Apr-2022 05:56 PM |
05-May-2022 10:30 AM |
05-May-2022 11:00 AM |
STG-II/Dr NTTPS/Tender Notice No.E-39/2021-22/CE/OM/Dr NTTPS(SE/OM/Stage II)/496865 |
Andhra Pradesh |
-- |
5. |
27-Apr-2022 06:05 PM |
05-May-2022 10:30 AM |
05-May-2022 11:00 AM |
PROVIDING C.C. DRAINS AND R.C.C. COVER SLABS AT OPPOSITE CHURCH STREET, YETIMOGA, 14TH DIVISION./ROC.NO.412201/2022/E2/498978 |
Andhra Pradesh |
-- |
6. |
21-Apr-2022 11:57 AM |
05-May-2022 11:00 AM |
05-May-2022 11:01 AM |
Supply and installation of Desktop Systems 25 systems at PG Lab in the Department of Information Technology/JNTUGV/IT/PG Lab/25 Desktop Systems /2021-22/2 Date: 21.04.2022/497114 |
Andhra Pradesh |
-- |
7. |
20-Apr-2022 05:57 PM |
05-May-2022 11:00 AM |
05-May-2022 11:30 AM |
Dr.NTTPS/E-01/2022-23 of CE/OM/Dr.NTTPS(SE/OM/Stage-IV)/496975 |
Andhra Pradesh |
-- |
8. |
29-Apr-2022 01:00 PM |
05-May-2022 11:15 AM |
05-May-2022 11:30 AM |
DrNTTPS-CM-II-Clearing of jungle inside and outside of the compound wall around godowns and offices of stage-I,clearing the strom water drain,drains and dust bins,miscellaneous works of Stage-I,II,III,RM yard and storage godowns,Repairs and servicing of rolling shutter stg-I godown,maintance of existing solar power fencing over the compound wall of power house for the period from 01-04-2022 to 31-03-2023/NIT.No.e-14/2022-23/SE/C/OM/Dr.NTTPS/499503 |
Andhra Pradesh |
-- |
9. |
29-Apr-2022 12:41 AM |
05-May-2022 11:15 AM |
05-May-2022 11:30 AM |
Drnttps-Stage-IV-Miscellaneous civil maintenance works,clening of dust bins and servicing of rolling shutter in Stage-IV area during the year 2022-23/NIT.No.e-12/2022-23/SE/C/OM/Dr.NTTPS/499538 |
Andhra Pradesh |
-- |
10. |
29-Apr-2022 04:42 PM |
05-May-2022 11:30 AM |
05-May-2022 12:00 AM |
Tungabhadra Hydro Electric Scheme/e-P11/2021-22 of SE/TBHES/499694 |
Andhra Pradesh |
-- |