• भारत सरकार की ई-खरीद प्रणाली - सहायता केंद्र न.- ०१२०-४७११ ५०८, ०१२०-४२००४६२, ०१२०-४००१००२, ०१२०-४००१००५


केंद्रीय - 7 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 3140
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
61. 24-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from return water to 27 meter level in Hydro Cyclone Section of Kathara Washery/PO/KTW/EnM/eTen/25-26/28 Dated-24.06.2025/2025_CCL_338306_1 Central Coalfields Limited --
62. 13-Jun-2025 05:00 PM 05-Jul-2025 11:00 AM 05-Jul-2025 02:00 PM FABRICATION OF SPIRAL CASING AS PER DRG. NO. 02020/E2553011/E2553011 BHEL Bhopal --
63. 20-Jun-2025 10:00 AM 05-Jul-2025 11:00 AM 05-Jul-2025 11:00 AM PIPING MODIFICATIONS WORKS AT BRDS TKRS/2500021424-HB-01225/132086 Hindustan Petroleum Corporation Limited --
64. 25-Jun-2025 09:00 AM 05-Jul-2025 11:00 AM 05-Jul-2025 12:00 PM BKSE000177/BKSE000177/2025_BHEL_49844_1 Bharat Heavy Electricals Limited --
65. 18-Jun-2025 06:55 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM Making shed for Storage of HEMM tyres near Regional Store in Khadia Project/GM/KHD/C/25-26/ETN-43 Date 18.06.2025/2025_NCL_337839_1 Northern Coalfields Limited --
66. 21-Jun-2025 12:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM TC wk for SM bk of HQ IGAR (S) at Mantripukhri/VIII.14064/18/IGAR(S)/2025/456/2025_ARMHA_865612_1 Assam Rifles - MHA --
67. 24-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM (A)Complete repairing and overhauling of (02 Nos.) magnetic separator drum assembly of Unit No. 220 and 222 and (B)repairing and overhauling of (03 Nos.) motorized gear box of Unit No. 218, 220 and 222 in HMS Section of Kathara Washery/PO/KTW/EnM/eTen/25-26/25 Dated-24.06.2025/2025_CCL_338301_1 Central Coalfields Limited --
68. 24-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of Pump No. 1 and 3 (River Side) including making of flange as per required under Kathara Washery/PO/KTW/EnM/eTen/25-26/29 Dated-24.06.2025/2025_CCL_338307_1 Central Coalfields Limited --
69. 25-Jun-2025 10:00 AM 05-Jul-2025 11:00 AM 07-Jul-2025 12:00 PM Laying and fitting of 6 inch M.S pipe line for installing of pump Motor with foundation at 17-18L/1D of Rana Seam (R-V) at Bhanora West Block Colliery under Satgram-Sripur Area/ECL/SSA/GM/E M/E-NIT/2025-26/13 Date 21.06.2025/2025_ECL_338166_1 Eastern Coalfields Limited --
70. 25-Jun-2025 05:30 PM 05-Jul-2025 11:00 AM 05-Jul-2025 11:30 AM MANPOWER OUTSOURCING/GEM/2025/B/6381498/B1/2025_DoDP_803079_1 Department of Defence Production --